Passer au contenu

Cette page n'est pas offerte en français.

Blogue

Construction change orders are eating your margins. The problem is how slowly they get processed.

Change orders are inevitable. The damage comes from the weeks between a scope change in the field and a number in the budget. Here is how to close that gap.

BY SIMPLYASK · MAR 28, 2026 · 4 MIN READ

Sur cette page
  1. Why do change orders take so long?
  2. What do faster firms do differently?
  3. What does an automated change order workflow look like?
  4. Where should you start?
A short row of orange traffic cones across a gravel work area, with one cone being lifted by a worker in dark overalls, in Parksville, British Columbia.

Construction change orders cost margin less because of the changes themselves than because of how slowly they get processed. Every change is a chain: field, project manager, owner, contract sum. The longer that chain takes, the longer a crew works on revised scope with no approved budget behind it. Shorten the chain and the cost shows up while it can still be managed.

Change orders are meant to be a controlled way to adjust scope when conditions shift. In practice they are one of the more reliable drains on a contractor's margin, and general contractors work on thin margins to begin with. Most causes are unavoidable, but all are manageable if the response moves as fast as the work.

Why do change orders take so long?

The steps are simple. The field superintendent signs off on a scope change. The project manager reviews it and writes a change order request. The owner or architect approves it, perhaps after pushback and a revision. Then someone updates the contract sum.

Each step involves a different person and often a different system, usually email or a shared drive nobody can find. A buried utility line turns up on Monday. The field team documents and photographs it and sends a request. The project manager gets to it on Thursday because three other requests are ahead of it. The owner's representative takes another week. By the time the change order is executed, the crew has been building the revised scope for weeks. If the approved amount comes in below what was spent, nobody learns that until the monthly cost report.

The same slow loop drives rework. A deficiency visible in an inspection photo that nobody reviewed in time, a spec change that never reached the crew, a verbal substitution nobody documented: these are coordination failures. The fix has the same shape. Capture the item in a structured form, route it to the responsible party with a deadline and escalate if the deadline passes.

What do faster firms do differently?

Not much that is exotic. They connect the steps that email separated. CMiC, a construction software vendor, says cost savings of 8% to 12% and schedule improvements of 10% to 15% are common among early adopters of integrated cost control, with benefits often appearing within 12 to 18 months.1 It also notes that high-performing companies track costs daily and, in some cases, hourly.1 Treat those as a vendor's observations, not audited results. Shorter gaps between spend and record mean fewer surprises.

What does an automated change order workflow look like?

On the SimplyAsk platform, the workflow is an AI App built from a Process, human tasks and an AI Agent where reading is needed.

A superintendent submits the change through a mobile form with photos, a cost estimate, affected drawings and a reason code. That submission starts a Process that routes it to the right project manager based on the project, the cost threshold and the type of change. Below a pre-approved threshold, it moves to the owner's representative for acknowledgment. Above it, a review task goes to the project manager with every attachment in place.

Each review is a task with an owner and a deadline. The Process escalates automatically when a response is at risk. A project manager can see at a glance which change orders are pending, approved or stuck, and nobody wonders whether the owner's representative saw the request.

When a change is disputed or comes back with questions, the exception gets its own path. One audit trail records who raised which concern, when it was answered and how the final amount was set. That matters at closeout, when a dispute over change order pricing can hold up final payment. A timestamped history replaces the argument over who said what. Permissions are set once, so the right people see the right projects, and human approval stays in the loop wherever a cost threshold requires it.

Where should you start?

With the workflow that bleeds most. For many contractors that is the stretch between a signed time-and-materials ticket and a submitted change order request. Map it, set the thresholds, connect the field form to the project manager's queue and measure the gap before and after. Related workflows follow the same pattern; see document control and RFIs.

If change orders are cutting into your margin and you still run them through email chains, explore what the platform does for construction.

SOURCES

  1. CMiC, “How Firms are Preventing Construction Overruns in 2026”, published January 28, 2026. https://cmicglobal.com/resources/article/how-firms-are-preventing-construction-overruns. Accessed November 17, 2026. Back to the text

Written by SimplyAsk.

PARTAGER

CONTINUER À LIRE